Skip to content
Conscious Asset
  • Consulting
    • Asset Performance Management
    • Maintenance Management
      • Maturity Assessment
      • Business Case Estimator
      • Maintenance Coaching
    • MRO Spares
      • MRO Spares White Papers
      • Supply Chain and Inventory Analysis Case Study
        • Remote Supply Chain Analysis
    • Reliability Management
      • Business Case Estimator
      • Reliability Maturity Assessment
      • Reliability Centered Maintenance – Re-Engineered RCM-R
      • Root Cause Failure Analysis
      • Reliability Analysis
        • Reliability Data Analysis Case Studies
          • Work Order Analysis – feedback meeting example
      • Pipeline and Gas Reliability
    • Special Services
      • Expert Witness
      • Finance your project
      • Staffing
    • Technology Support
  • Learning
    • Catalog
    • My account
    • Registration
  • Events
  • Information
    • Blog
      • UPTIME
      • Reliability
      • Asset Management
      • Change Management
      • Planning and Scheduling
      • Risk Management
      • Technology
      • Consulting
      • MRO
    • Books
    • Case Studies
  • About Us
    • Our Team
    • Partners and Affiliations
    • Clients
    • Careers – Consulting, Training, Sales
  • Contact
Conscious Asset Blog Blog

Myth Busting 8: Who should schedule work

  • 2018-07-272020-06-20

Myth Busting SeriesThis myth is about who should schedule work.

There are three roles involved here: planners who plan the jobs, supervisors who supervise their crews and schedulers who create the work schedule.

Planning, as stated before, is all about what work gets done and how.

Scheduling is about when the work gets done. The practical constraint is that no work goes on a schedule until you are sure you have everything you need to execute that work when you schedule it.

It’s like baking in your kitchen. You wouldn’t start a cake or other baked good, without the ingredients being on hand unless you knew they were coming in on time before you need to use them. So, if the baking soda isn’t available you’ll make sure you get it before you start. If you don’t, then your baking will be stalled while you go get it. Maintenance is much the same. Don’t start until you have all that you need on hand.

Making sure all that is available isn’t planning. Planning actually tells you to want you will need – it’s sort of like writing the recipe. Planning is done by a planner. Scheduling is an activity in which we check on availability of resources before putting the job onto the works schedule for any given week. Scheduling is done by a scheduler or, in many organizations, by a planner. Regardless of who does it, planning and scheduling are two different activities.

Arguably the checking on resource availability (particularly for parts and materials) is neither planning nor scheduling. It is a resource marshalling or coordination role. Since most of the work is about making sure parts are available. Indeed, some organizations have a materials coordinator role that supports scheduling using the materials called for in the job plans that are created by planners. That materials coordinate can work for the materials/supply chain people or for maintenance – it really doesn’t matter, but the function is critical to scheduling.

OK – so planners can schedule work, but it doesn’t need to be them. Scheduling does not take the technical skills/knowledge that planning requires. It really only requires good organizational skills to produce a schedule. The nature of the work being done by the trades being assigned to the work is not really relevant to scheduling. However, the number of trades available with those skills as specified in the plan is needed.

Should a supervisor schedule? My answer is no, although it is a somewhat common practice.

Wherever I’ve seen supervisors doing the bulk of the work scheduling, they are doing it in response to the immediate priorities of the operational departments, which are usually driven more by emotion than accepted scheduling parameters of priority and criticality. They must, by the nature of their work, maintain good relationships with operational staff. It is quite natural for them to want to please their “customer” in operations. In doing so, they often bow to the wishes of the day, meaning (usually) whatever the operator says he needs. Operators are not usually worried about overall production goals, they are interested in what is happening on their shift. Anyone who has operated in a plant or factory or similar environments will attest to that. If something is going to go wrong, you don’t want it to happen “on my watch”.

Supervisors are too close to the day-to-day ups and downs of normal operations and dealing with the myriad of problems that invariably arise, to do a good job of scheduling. They tend to be very good at reacting and putting out the panic-du-jour, but not always so good at looking far ahead. Scheduling looks farther ahead and considers more factors than a supervisor will have top of mind. Scheduling should be done by the scheduler or planner who does scheduling taking into account priorities, criticalities, the availability of resources across the trade and plant, availability of materials for each job, willingness of operations to release equipment for work, etc. Doing that on the fly as supervisors will tend to do (most of the time) risks ignoring some critical factors and sub-optimizing the workforce deployment and overall effort to keep backlogs under control.

Facebooktwitterredditpinterestlinkedinmail
Myth Busting 7: Planning meetings
Myth Busting 9: Planners do all the planning

Currency converter

Currency conversions are estimated and should be used for informational purposes only.

Newsletter Sign-Up

reCAPTCHA demo: Simple page

Follow us on Twitter

Tweets by @@ConsciousAsset

Contact Us

  • Email
    info@consciousasset.com
  • Phone
    +1-705-408-0255
  • Address
    92 Caplan Avenue, Suite 624
    Barrie, ON L4N 9J2

USA Office

  • Email
    info@consciousasset.com
  • Phone
    +1-509-838-2548
  • Address
    400 S. Jefferson, Suite 301
    Spokane, WA 99204

Experience, Insight, Honest Advice

Let's Talk

Conscious Asset

  • Email
    info@consciousasset.com
  • Phone
    +1 705 408 0255
  • Address
    92 Caplan Ave., Suite 624
    Barrie, ON Canada L4N 9J2

Newsletter

reCAPTCHA demo: Simple page

Recent Blog Posts

  • The benefits of proactive maintenance
  • Are you informed, or data distracted? You need AIM
  • Proactive maintenance is more Covid, how “covid” is yours?
  • Pay $3k to keep out of trouble, or more to get out of jail
  • How to keep the boss out of jail
  • Interview with MRO Magazine – part 2
  • Business Case Estimator Insights
  • What I’m learning about Online Training

Articles

  • Assessment 2
  • Asset Information Management 1
  • Asset Management 41
  • Blog 100
  • Business case 11
  • Change Management 23
  • Condition Monitoring 3
  • Consulting 28
  • contracting 1
  • Finance 1
  • KPIs 3
  • MRO 12
  • Outsourcing 1
  • Performance Management 12
  • Planning and Scheduling 13
  • Processes 2
  • Reliability 44
  • Risk Management 13
  • Shutdowns 1
  • Strategy 7
  • Teamwork 5
  • Technology 12
  • Training – online 9
  • UPTIME 94
Copyright 2021 | Conscious Asset
Theme by Colorlib Powered by WordPress
  • Home Page
  • Blog
  • Website Terms of Service
  • Learning
  • My account

Login

Forgot Password?

Create a new account

Insert/edit link

Enter the destination URL

Or link to existing content

    No search term specified. Showing recent items. Search or use up and down arrow keys to select an item.