Pipeline and Gas Reliability
These articles are written by Fred K Geitner, a highly experienced and well-regarded machinery engineer and author. His career in the Oil and Gas Industry in refining, petrochemicals and transmission pipelines. He has some 8 books that he co-authored with the late Heinz P Bloch, and numerous columns published in “Pipeline and Gas Technology”. With Fred’s permission, we are including them here for the use of our readers.
If you are interested in books on Equipment Reliability, Process Plant Equipment Maintenance, Compressors and Failure Analysis, you can find them on Amazon: Fred Geitner’s Books
- Turnaround (shutdown) Quality Assessment: PL&G0009
- How should you treat your spare machinery? PL&G0012
- Turbo-compressor Gas Seals: PL&G0103. Experience with dry running gas seals in high-speed critical turbo-machinery.
- We want it right away: PL&G0109R This article is about the risks of waiting to do a repair on redundant systems.
- A Machinery Maintenance Strategy: PL&G0203
- No news is good news: PL&G0206R Do you always need the OEM representative on-site?
- Machinery Operators: PL&G0209 About not overlooking operator training to ensure reliable operations.
- How to track machinery availability: PL&G0303
- Rod load monitoring for reciprocating compressors: PL&G0306
- Try statistical failure analysis: PL&G0309
- Inspection Frequencies: PL&G0412 Determining inspection frequencies for age-related and random failures.
- ODR and PdM: PL&G0512 Operator driven reliability and its relationship with Predictive Maintenance.
- Not so “auxiliary” systems: PL&G0603 Buffer gas systems are critical to success with gas seals – some lessons.
- Evaluation of machinery alternatives using Life Cycle Costing – part 1: PL&G0605
- Evaluation of machinery alternatives using Life Cycle Costing – part 2: PL&G0709
- Gas Engines: PL&G0612. A bit of interesting history of these major industrial contributors.
- Compressors and process equipment: PL&G0706. Storage and preservation – some handy tips.
- Maximizing uptime: PL&G0712. Compressor train reliability audits.
- Operation and maintenance of turbo-compressors: PL&G0803
- Reciprocating compressor condition monitoring: PL&G0806
- How to achieve quality compressor Maintenance – a synopsis: PL&G0809
- Lubrication and reliability: PL&G0902
- Understanding drive couplings: PL&G0905
- Compressor drivers and cost of ownership: PL&G0909
- Improving reciprocating compressor reliability: PL&G1003
- Compression for the mid-stream petrochemicals market: PL&G1005
- Root cause failure analysis for machinery: PL&G1010
- Why permanently installed torque meters make economic sense: PL&G1011